Bridge Construction - HWY 893, North of Islay
August 25 2025
Please be advised of a temporary bridge closure on August 28, 2025 6 KM north of Islay on HWY 893 The bridge will be closed for repair operations.
Please be prepared to stop, stoppages of up to 20 minutes closures are expected.
The speed limit will be reduced to 50 km/hr through construction zones. Flag persons or signal lights will be present to control traffic through the construction zone in alternating traffic patterns. Motorists should be prepared to stop and obey all construction signage and speed limits when driving through the area.
This project has been added to Alberta 511, updates will be posted at 511.alberta.ca